Support WBURBertha Finally Breaks Through In SeattlePlay02:59Download AudioMartin KasteApril 04, 2017 ShareWorkers prepare a gravel pad as a massive crane is used to lift a 2,000-ton section of the tunnel boring machine known as "Bertha" in March 2015. The project was stalled for two years as engineers struggled to repair the gigantic machine. (AP)